Period of Service: October 2013 - August 2017
The project was to implement the Functional Safety Management (as per IEC 61511/61508) as well as process hazards analysis in the industry standards and emerging practices that apply to control systems, safety instrumented systems and automation system in general. The typical project work was to install the Yokogawa SIS (Prosafe-RS platform) as a standalone system or integrate it with the existing DCS.
HMI (Human Machine Intercafe) in the CCR (Central Control Room)
System Generation - Programming / Logic Generation
System Generation - Equipment Tuning Analysis Panel
Outdoor / Indoor System Panel Installation
Projects | Client / End User | Year |
---|---|---|
Balongan IHLA (Integrated High Level Alarm), Indramayu | Pertamina RU VI Balongan | 2017 |
SCADA Balongan Mundu, Indramayu | Pertagas Mundu | 2016 |
IKPP Perawang - RB12-CM13-MB26 Migration (Commissioning Phase) | IKPP (Indah Kiat Pulp & Paper) | 2016 |
PKT - Upgrade Control PLC Unit 3000 (Commissioning Phase), Bontang, East Kalimantan | Pupuk Kalimantan Timur | 2016 |
KPI - Total Migration to Centum VP (Phase II), Bontang, East Kalimantan | Kaltim Parna Industri | 2016 |
PKT - Upgrade Control PLC Unit 3000 (Engineering Phase), Bontang, East Kalimantan | Pupuk Kalimantan Timur | 2015 |
Balongan Pilot Project for Tank Overfill Protection System, Indramayu, West Java | Pertamina RU VI Balongan | 2014 / 2015 |
Smelting - Gas Blower Shutdown System, Gresik, East Java | Smelting | 2013 / 2014 |